DB Netz AG

Planning Services for Level Crossings: Railway Line Wanne­-Eickel – Hamburg

On the railway line Wanne­-Eickel – Bremen – Hamburg several level crossing instal­la­tions, which have reached the end of their lifetime, were replaced by the new techno­logy of the type BUES 2000. In the project extensive services, among other things, of the basic evalua­tion, preli­mi­nary, draft and approval planning had to be performed by GRABAND for the railway enginee­ring systems including adapting the interlo­ckings, surveying as well as landscape conser­va­tion planning.