Project Management through all Phases
Deutsche Bahn AG
Commissioning Concept: Interlocking, Junction Halle incl. Train Formation Yard Zugbildungsanlage
For increasing capacity and speed with simultaneous rationalization of the infrastructure at the junction Halle the existing operation facilities were replaced by modern electronic interlocking technology including track-diagram rebuilding and train formation yard. For this extensive services for drawing up and updating a commissioning concept, of the project management as well as for analyzing functional locations had to be performed by GRABAND for the entire technical equipment and several construction stages.