Deutsche Bahn AG

Commis­sio­ning Concept: Interlo­cking, Junction Halle incl. Train Formation Yard Zugbil­dungs­an­lage

For incre­asing capacity and speed with simul­ta­neous ratio­na­liza­tion of the infra­struc­ture at the junction Halle the existing operation facili­ties were replaced by modern electronic interlo­cking techno­logy including track­-diagram rebuil­ding and train formation yard. For this extensive services for drawing up and updating a commis­sio­ning concept, of the project manage­ment as well as for analyzing functional locations had to be performed by GRABAND for the entire technical equipment and several construc­tion stages.